The engagement of this project has ended
Do you want to receive an email when news items are posted?
This study reports findings of the study to seek to minimise the increase in height of the road levels of A400 Hampstead Road due to the HS2 works at either end of Hampstead Road Bridge.
The aim of this study was to identify the options that would achieve lower road levels at either end of the re-provided Hamstead Road Bridge in order to reduce the impact on local residents and neighbouring buildings as well as on non-motorised users (NMU) of A400 Hampstead Road.
The report has been considered by the Promoter (DfT) which has accepted HS2’s recommendation. You can read the report here .